What an SF 1408 preaward survey actually checks

Before a cost-type award, the government checks whether your accounting system can handle it. Here is what the form covers.

Book a scoping call Request a proposal

Last reviewed

If you are moving from firm-fixed-price work toward cost-reimbursable contracts, at some point a contracting officer will want to know whether your accounting system is adequate. The instrument used is Standard Form 1408, under FAR 9.106-4.

It is less mysterious than its reputation suggests. It is a checklist, and you can work through it yourself before anyone works through it with you.

What the form looks for

  • Segregation of direct costs from indirect costs
  • Identification and accumulation of direct costs by contract
  • A logical and consistent method for allocating indirect costs to cost objectives
  • Accumulation of costs under general ledger control
  • A timekeeping system that identifies employee labour by cost objective
  • A labour distribution system charging direct and indirect labour appropriately
  • Interim determination of costs, at least monthly
  • Exclusion of costs unallowable under FAR Part 31
  • Identification of costs by contract line item where required
  • Segregation of preproduction costs from production costs

Where contractors actually fail

Timekeeping, more than anything else, not the software: the discipline. Time recorded daily, by the employee, against the correct cost objective, with a documented correction process. Retrospective timesheets completed monthly do not survive review.

Unallowable costs. FAR Part 31 makes certain costs unallowable: some entertainment, some advertising, interest, certain legal costs. They must be identified and segregated as incurred, not stripped out at year end.

Inconsistent allocation. Whatever your indirect method is, it must be applied consistently. Changing it because it produces a better answer on a particular contract is the thing the rules exist to prevent.

The most expensive misunderstanding

There is no such thing as DCAA-approved accounting software. DCAA evaluates a *contractor's system*, and makes a determination about that specific contractor.

Plenty of compliant systems run on QuickBooks. Plenty of non-compliant ones run on expensive specialist platforms. Configuration, written policies and daily discipline are what get assessed.

Common questions

Not answered here? Ask us directly: we would rather explain it than have you guess.

How long does it take to get ready?

For a small contractor starting from ordinary commercial books, typically four to eight weeks: restructuring the chart of accounts, establishing the indirect rate structure, implementing timekeeping and writing the policies. The long pole is usually timekeeping, because it requires people to change a daily habit.

Do we need this for a Phase I SBIR?

Usually not. Phase I awards are frequently firm-fixed-price, which carries much lighter requirements, but build the structure anyway. Retrofitting cost segregation and timekeeping onto historical records is expensive, and it is the single thing most likely to delay a Phase II or cost-type award.

How do we start?

Book a scoping call using the form on this page, or call us. We will ask what you need, who is asking you for it, and what condition your records are in, then tell you what the engagement involves and what it will cost before anything begins.

Book a scoping call

Twenty minutes, no charge. Tell us what you need and we will tell you what it involves, what it will take, and whether we are the right fit for it.

  • A short call with the person who would actually do the work.
  • A clear scope and a fixed quote before anything begins.
  • We reply to every enquiry within one business day.

Prefer to talk now? Call (310) 220-0248
Monday to Friday, 9am to 6pm PT

Add a number and our AI assistant will call you shortly to set up your scoping call. Leave it blank if you would rather we email.

Free resource

The SF 1408 readiness checklist

SF 1408 is the form a DCAA auditor fills in about your accounting system. The checklist is the same list, restated as things you can go and check in your own ledger this week.

  • Segregating direct from indirect cost, and the account structure that proves it
  • Timekeeping that survives a floor check
  • Pooling and allocating indirect cost consistently
  • Excluding unallowable cost under FAR Part 31 before it reaches a bill