Serving the South Bay & West Los Angeles Rated 5.0 on Google Reviews (310) 220-0248
Low-rise commercial buildings and palm trees in El Segundo, California

Audit Preparation

DCAA-compliant accounting for government contractors

A cost-type federal contract requires books structured the government's way. It is not complicated, but it is checked before award.

Book a scoping call Request a proposal

Last reviewed

Winning a first cost-type federal contract usually means changing how the books are kept. The government needs to see costs captured by contract, indirect costs pooled and allocated consistently, and unallowable costs kept out of what it is billed.

This is accounting system work, not an audit. We design, set up and run the system, and get you ready for the government's review of it. Many firms that advertise this work are national and remote. We are local to the South Bay.

What the government actually checks

SF 1408, Preaward Survey of Prospective Contractor. Accounting System · FAR 9.106-4

Before awarding a cost-reimbursable contract, a contracting officer needs assurance that your accounting system can properly account for costs. The instrument used is Standard Form 1408.

The core requirement is cost segregation: direct costs separated from indirect, government work separated from commercial, and costs accumulated by contract and by cost objective. Plus timekeeping that supports the allocation, and exclusion of unallowable costs under FAR Part 31.

A critical point of confusion: DCAA does not "approve" accounting software or accounting firms. It makes a determination about a specific contractor's system. Buying a particular product does not make you compliant: how you configure and operate it does.

What an adequate system needs to demonstrate

  • Segregation of direct and indirect costs
  • Identification and accumulation of direct costs by contract
  • A logical and consistent method for allocating indirect costs to cost objectives
  • Accumulation of costs under general ledger control
  • A timekeeping system that identifies employee labour by cost objective
  • A labour distribution system that charges direct and indirect labour appropriately
  • Interim determination of costs: at least monthly
  • Exclusion of costs that are unallowable under FAR Part 31
  • Identification of costs by contract line item where required
  • Segregation of preproduction costs from production costs

How we work with contractors

  1. Assessment

    Where your current system sits against the SF 1408 criteria, and what specifically would fail. Usually there are three or four real gaps, not thirty.

  2. Design

    Chart of accounts restructured for direct and indirect segregation, an indirect rate structure that suits your actual cost base, and a timekeeping process people will follow.

  3. Implementation

    Configuration, written policies and procedures, which the government will ask to see, and training for the people entering time and coding costs.

  4. Preaward readiness

    Walking through the SF 1408 checklist as a reviewer would, before a reviewer does.

  5. Ongoing

    Monthly close, rate monitoring against provisional billing rates, and preparation of the annual incurred cost submission.

Take this with you

The SF 1408 readiness checklist

SF 1408 is the form a DCAA auditor fills in about your accounting system. The checklist is the same list, restated as things you can go and check in your own ledger this week.

  • Segregating direct from indirect cost, and the account structure that proves it
  • Timekeeping that survives a floor check
  • Pooling and allocating indirect cost consistently
  • Excluding unallowable cost under FAR Part 31 before it reaches a bill

There is no instant download. A person sends it, usually the same working day.

Common questions

Not answered here? Ask us directly: we would rather explain it than have you guess.

We just won our first SBIR. Do we need all of this?

Phase I SBIR awards are frequently firm-fixed-price, which carries lighter accounting requirements. Phase II and cost-type work is where the SF 1408 conversation becomes real. The practical advice is to build the structure early anyway. Retrofitting cost segregation and timekeeping onto two years of history is far more painful than starting correctly, and it can delay your next award.

Does buying a particular accounting system make us DCAA compliant?

No. This is a common and expensive misunderstanding. DCAA evaluates a contractor's system, not software. Plenty of companies run compliant systems on QuickBooks with proper configuration and discipline, and plenty run non-compliant systems on expensive government-contracting platforms. The configuration, the written policies and the day-to-day operation are what is assessed.

What is an incurred cost submission?

An annual submission reconciling your actual indirect rates to the provisional rates you billed at during the year, due six months after your fiscal year end for contractors with cost-type work. It is a substantial schedule-based filing. Schedules A through to the claim itself. Submissions found inadequate come back, and repeated inadequacy causes real problems with your contracting officer.

What are provisional billing rates?

Because your actual indirect rates are not known until the year is over, you bill during the year using provisional rates agreed with the government, then true up through the incurred cost submission. Setting them too low starves cash flow all year. Setting them too high creates a repayment liability at true-up. Getting them close is a genuine planning exercise and one of the more valuable things a CFO-side advisor does for a contractor.

Can you help if a review has already found our system inadequate?

Yes, and it is a recoverable position. An inadequate determination identifies specific deficiencies, which gives you a defined list to work against. The usual causes are timekeeping, unallowable cost identification and inconsistent indirect allocation. All three are fixable, and a corrective action plan that shows the government you understand the finding goes a long way.

How do we start?

Book a scoping call using the form on this page, or call us. We will ask what contracts you hold or are bidding for, what system you run today, and what condition your records are in, then tell you what the work involves and what it will cost before anything begins.

Book a scoping call

Twenty minutes, no charge. Tell us what you need and we will tell you what it involves, what it will take, and whether we are the right fit for it.

  • A short call with the person who would actually do the work.
  • A clear scope and a fixed quote before anything begins.
  • We reply to every enquiry within one business day.

Prefer to talk now? Call (310) 220-0248
Monday to Friday, 9am to 6pm PT

Add a number and our AI assistant will call you shortly to set up your scoping call. Leave it blank if you would rather we email.

Free resource

The SF 1408 readiness checklist

SF 1408 is the form a DCAA auditor fills in about your accounting system. The checklist is the same list, restated as things you can go and check in your own ledger this week.

  • Segregating direct from indirect cost, and the account structure that proves it
  • Timekeeping that survives a floor check
  • Pooling and allocating indirect cost consistently
  • Excluding unallowable cost under FAR Part 31 before it reaches a bill

There is no instant download. A person sends it, usually the same working day.